References

Long experience, related to municipal infrastructure, which is the foundation of our business success, has resulted in our successful conduct of more than 250 projects in a 15 years period. Project documentation is divided according to areas and it has been designed for the following municipalities: Ljig, Smederevska Palanka, Arilje, Lajkovac, Obrenovac, Malo Crniće, Užice, Žitorađa ...

 

Reference List for Waterworks


Object Design Location Year Gallery
Lebane water supply (water main, purification installations, distributing network, tank volume I I II high altitude zone) MAIN Lebane 1981  
Jagodina water supply with water treatment plant MAIN Jagodina 1981  
Smederevska Palanka water supply MAIN Smederevska Palanka 1993  
Water supply of southern part of the Municipality of Lazarevac PRELIMINARY Lazarevac 2001  
Lajkovac water supply MAIN Lajkovac 2002  
Nikšić Parish water supply (3 high altitude zones) PRELIMINARY Nikšić 2004  
Water supply of the Municipality of Ljig with prefeasibility study GENERAL Ljig 2006*  
The main water pipeline from the spring "Ba" to town Ljig MAIN Ljig 2007  
Primary water network in first altitude zone of town Ljig (tank of the high altitude zone, water network, plant for increasing pressure for II high altitude zone) PRELIMINARY Ljig 2007  
Water network of settlement Belanovica MAIN Belanovica, Municipality of Ljig 2007  
Main pipeline of settlement Salakovac PRELIMINARY AND MAIN Salakovac, Municipality of Malo Crniće 2007  
Secondary water network of settlement Draževac PRELIMINARY AND MAIN Draževac, Municipality of Obrenovac 2007 Galerija
Main pipelines from settlement Salakovac to the industrial zone “Salakovac” PRELIMINARY AND MAIN Salakovac, Municipality of Malo Crniće 2007  
Reconstruction of water supply system “Lukavica” PRELIMINARY AND MAIN Nikšić Parish, Nikšić 2008 Galerija
Reconstruction of water supply network in settlement Dudovi MAIN Obrenovac 2008  
Water supply of the Municipality of Arilje with the previous justification study GENERAL Arilje 2008  
* All projects until 2007. were chosen by some of the personal references of the company’s owner Miroljub Gaon, civil engineer, and since 2007. it has been the reference list of WIGA PROJECT GROUP.

top

Reference List for Sewerage System


Object Design Location Year Gallery
Wastewater treatment plant in Petrovac na Mlavi MAIN Pertrovac na Mlavi 1982  
Industrial waste water Prahovo MAIN Prahovo 1990  

The sewerage network of Lajkovac with purification plant

PRELIMINARY Lajkovac 2000  

Wastewater treatment plant in Lajkovac

MAIN Lajkovac 2002  

The sewerage network of Lebane with the wastewater treatment plant

MAIN Lebane 2004  
Collection, drainage and treatment of wastewater in Sopot with the previous justification study GENERAL Sopot 2007*  

The sewerage network of settlement Belanovica

PRELIMINARY Belanovica, Municipality of Ljig 2007  

Collection, drainage and treatment of wastewater in settlement Barič

PRELIMINARY  Barič, Municipality of Obrenovac 2007  

Collection, drainage and treatment of wastewater in settlement Zvečka

PRELIMINARY Zvečka, Municipality of Obrenovac 2007  

The sewerage network of the Local Community of Belo Polje

PRELIMINARY AND MAIN LC Belo Polje, Obrenovac 2008  

Collection, drainage and treatment of wastewater in Lajkovac with the previous justification study

GENERAL Lajkovac 2008  

Sewers on the Valjevo road

PRELIMINARY AND MAIN Obrenovac 2008  

Repairing, reconstruction and designing of new sections of the main sewers in the sewerage network of Obrenovac

PRELIMINARY AND MAIN Obrenovac 2008  
All projects until 2007. were chosen by some of the personal references of the company’s owner Miroljub Gaon, civil engineer, and since 2007. it has been the reference list of WIGA PROJECT GROUP.

top

 

Reference List for Internal Installations


Object Design Location Year Gallery
Internal installation of water supply, sewerage, hydrant network and sprinkler installation for residential and business object in the Stanka Vraza Street. MAIN Zvezdara, Belgrade 2007  
Internal installation of water supply, sewerage, hydrant network and sprinkler installation for residential and business object in 10 Gružanska Street MAIN Red Cross, Belgrade 2007  
Internal installation of water supply, sewerage, hydrant network and sprinkler installation for residential and business object in 2 Gružanska Street MAIN Crveni krst, Belgrade 2007  
Internal installation of water supply, sewerage, hydrant network and sprinkler installation for commercial/business premises of the cemetary "ZBEG" MAIN Krnjača, Belgrade 2007  

Addition to Main design and design for building of administrative building “Farmalogist” in Mirijevski Boulevard:

  • internal installation of sewerage and hydrant network
  • internal thermo-technical installation
  • internal installation of weak current
  • electroenergetic installation i electric motor drive
  • architectural - construction design
MAIN Palilula, Belgrade 2008  
Internal installation of water supply, sewerage, hydrant network of multi-purpose sports hall “Bagremar” in Pancevo PRELIMINARY AND MAIN Pančevo 2008  

top

Reference List of Other Projects


Object Design Location Year Gallery
Design of chlorination of water network in Slavkovica (supply, chlorine equipment and technology with the necessary facility and electric power) PRELIMINARY Slavkovica, Municipality of Ljig 2007  
Addition to Main design in the area of protection of soil of surface and ground water of the regional landfill “Duboka” in Užice MAIN Užice 2007  
Drainage around the hall for small sports MAIN Lajkovac 2007  
Drainage around Primary School “Mile Dubljević” MAIN Lajkovac 2007  
External installation of water supply, sewerage, stormwater drainage and hydrant network within the industrial zone “Salakovac” PRELIMINARY AND MAIN Municipality of  Malo Crniće 2008  
Study on the assessment of the influence of the industrial zone “Salakovac” on its environment   Municipality of  Malo Crniće 2008  
Sewer, stormwater drainage and water supply network in the Tamnavska Street phase IV PRELIMINARY AND MAIN Obrenovac 2008  

top

Performed Technical Controls


Name of technical control Year

Technical control of the Main water pipeline design from source "Ba" to town Ljig

2007

Technical control of the Main TT infrastructure project - distribution in the industrial zone “Zmič” - Paraćin

2007

Technical control of the Main TT infrastructure project – supply to the industrial zone “Zmič” - Paraćin

2007

Technical control of the Main project of dislocation of one part of water supply network “Barič” - Mala Moštanica

2007

Technical control of the Main project and the phases of road and traffic signals in the Kralja Aleksandra Street in Obrenovac

2007

Technical control of the Main project of the source of water supply of Kovin

2008

Technical control of the Main clean water pipeline project from PPV “Grgurovce” to breaking chamber in the water resources system “Šumanka” in the Municipality of Lebane

2008

Technical control of the main project of evacuation and treatment of waste water in Local Community Lesko, the Municipality of Tutin

2008

Technical control of the Main project of collection, drainage and treatment of wastewater in the Nature Park “Mokra Gora” - Book 1 Primary collector

2008

Technical control of the Main project for the construction of tapping facilities, transport pipeline, 2x150m 3  tank and 2 pumping stations as part of water supply of Nature Park “Mokra Gora”

2008

Technical control of the Main project for the construction of tapping facilities, transport pipeline, 2x150m 3  tank and 2 pumping stations as part of water supply of Nature Park “Mokra Gora”

2008

Technical control of the Main project of reconstruction of pumping station, thrust pipeline and tank on routes Ploča-Voćnjak-Tršić and Žeravija-Grnčara-Gnila

2008

top

Buliding sites


Objects under construction Commencement of works Phase Gallery
Reconstruction of part of the main pipeline in the length of 3000m, section from spring "Ba" to Ljig December 2007 completed Galerija
Building of  wellspring in settlement Batuša, the Municipality of Malo Crniće - construction of 120m deep well, construction of tank with volume of 100m3, pump and chlorination stations November 2008    
Building of tank with the capacity of 200m3, pump and chlorination stations, 1200m long water pipeline and construction of artesian well in settlement Podina, the Municipality of Žitorađa November 2008    

top

About Us
Gallery
Contact